The end result of this methodology was the commissioning of a reliable, grassroots MPC controller in 12 work weeks rather than the industry standard 4-5 months. The greatest challenge faced in this implementation was neither technical nor operational, according to Matrikon automation and optimization engineer Zul Bandali – it was achieving confidence in the results of the new method.
Download this case study to discover how Matrikon Control Performance Monitor helped BOC Gases quickly deploy the new APC system while maintaining safe and effective plant operation.
As published in:
Industrial Automation Asia
Nov 2007
IAA provides an unrivalled breadth of information by focusing on the automation needs of industries across the manufacturing spectrum – from discrete to batch to process. Vertically, the coverage is similarly comprehensive – from sensors and instruments on the factory floor, to control systems, right up to enterprise systems and networks.
ProcessingTalk
July 2007
ProcessingTalk is the email newsletter for engineers and managers in the process industries.