Deploying and maintaining Advanced Process Control (APC) Applications has always focused on a project-driven approach. Typically, this has involved open-loop step testing, modeling and commissioning as the key phases in getting the application running at the required performance levels. This traditional approach can often mean a 4-6 month deployment time frame and associated engineering costs per applications.
Attend this webcast, and hear from TaiJi Control guru Yucai Zhu and find out how a technology-based approach to APC Monitoring and PID Loop Tuning can exploit a powerful closed-loop modeling technique and significantly reduce the time involved with these intricate activities. Learn how closed-loop and multivariable step testing can improve your operations.